
It's late October and Black Friday is the big push, with the festive rush straight behind it. Marketing is loaded across every channel. The influencers have said yes, or you've shot your own videos and posted every one of them. The packaging looks great, the 3PL has the kit build instructions, you've been to the warehouse and done the walk and talk. All is well and you are on track.
Every November we're the warehouse at Parkway Link waiting to build what's in other people's containers. In our experience peak rarely fails on the big things. It fails on one pallet that didn't arrive, and on nobody having asked, back in October, the question that would have caught it.
What follows is what goes wrong, roughly in the order it happens, and what to ask your 3PL about each of them this week.
The container is due on the 4th. Your 3PL has the 4th in the diary, a goods-in slot booked and a team pencilled in to receive it. Then it's held at the port for a customs check, or the vessel is a week late, or it clears fine and one pallet out of eleven is missing. That pallet has the gift box lids on it. You now have ten pallets of kit you can't build.
The 3PL isn't being awkward when they say there's nothing they can do with it. Every brand's peak stock lands in the same fortnight, and every receiving bay is busy while it does.
So ask for a date. If the whole consignment doesn't land on the 4th, what's the last day they can still take it in, build it, pack it and get it out in time for Black Friday? A date, not "we'll work something out". Ask whether they'll book in and start building a partial if that's what turns up. Ask what they need on the cartons and the ASN to get it booked the same day, because the usual reason stock sits in a holding bay for three days is that the barcode on the outer doesn't match the one on the paperwork and nobody can reconcile it. And ask who your named contact is for the fortnight that matters, and who picks it up if that person is off.
You've sent the kit build instructions. Somebody at the 3PL has read them. That isn't the same as somebody at the 3PL having built one.
Packaging gets signed off from a rendered mock-up, and the box turns out 5mm too shallow once the insert goes in. Inserts and thank-you cards get delivered to the brand's office instead of the warehouse, and nobody notices until the build starts. The whole build lives in one person's head, and that person is on annual leave the week of the launch.
Ask whether they've physically built a sample from your instructions, and ask to see it. Ask whether all the consumables have arrived and been counted as well as signed for. Ask what the build rate per hour is and when they intend to start, because if the answer is "when the stock lands" and the stock lands late, your buffer is already gone. And ask whether the kit is a single SKU in their system or assembled to order from components. Either works, as long as it matches the way your website sells it, or stock stops coming off the moment the first order lands.
The link between your website and their warehouse system was set up months ago, for the products you had months ago. Black Friday adds a bundle and a limited edition, and some of those exist in your store and nowhere else. The first order with one in it lands in an exceptions queue while somebody works out what it is.
Ask them to put a test order through from your live site with the bundle in it and show you it landing correctly. Ask how often stock syncs back to the store and what the site does when a SKU hits zero, since overselling on Black Friday turns into a January of refunds. And check the cut-off on your homepage against their actual despatch cut-off. Marketing wrote "order by 2pm for next day". Ours is 2pm as well, as it happens, but somewhere behind that number is a pick cut-off and a carrier collection time, and plenty of brands have never asked what either of them is.
Your 3PL has planned labour and carrier capacity against your forecast, and your forecast was written before the influencer content went live. If it works the way you hope, you're sending them three times what they planned for, and a 24-hour SLA becomes 72 because they staffed for the number you gave them.
Carrier capacity is the other ceiling. Most carriers limit how much they'll collect from a site at peak, and the limit depends on the contract. A warehouse can pick and pack all day and still have a floor full of parcels nobody is taking away.
Ask what volume they've planned for you, where the ceiling sits before service slips, and what happens if you go through it. Ask how much extra labour they're bringing in and from when. Ask for the carrier last-despatch dates for guaranteed pre-Christmas delivery, by service, because they're usually earlier than the date on your homepage. And ask what the escalation route is if it does go wrong, and what the contract actually says about it.
Returns are the part nobody plans in October. In January the stock comes back, and whether it's checked and back on sale in three days or sitting in a cage for six weeks depends on a conversation you have now. Ask what the returns process is and how quickly returned stock is back on the shelf. Ask for the last date you can change packaging or inserts before they lock the build for peak.
And ask what went wrong for them last peak. Everyone had something. A 3PL that says nothing went wrong is either new or not telling you, and we'd rather hear the first answer.
If you'd rather run through these with us before the stock lands, we'll give you straight answers.